The following are very limited list of representative projects that highlight CGI Technical Services’s or our personnel’s experience. Please contact us if you would like a more extensive list of project descriptions for any of our professional disciplines.

GEOTECHNICAL ENGINEERING & ENGINEERING GEOLOGY
- North Market Force Main & Lift Station
- Stillwater Business Park Bridges
- Ambrosini School
- Owens Student Services Building, Simpson College
- Oakdale Heights Assisted Living Facility
- Best Buy Commercial Structure
- Redding, Fall River Mills, Round Valley, Lampson Field and Klamath Falls International Airports
- Fairchild Medical Center
- Cost Plus World Market Commercial Structure

CONSTRUCTION MATERIALS INSPECTION & TESTING
- Hilltop Development Phases I through IV
- Colusa Rice
- Safeway Retail Center & Fuel Station
- Caltrans QC/QA Districts 1, 2, 3, 6, 9 AND 10

GEOTECHNICAL ENGINEERING & ENGINEERING GEOLOGY

North Market Force Main & Lift Station
Redding
top

This $2-million project consists of the horizontal directional drilling (HDD) and replacement of a new sewer force main beneath the Sacramento River in the City of Redding. CGI Technical Services provided geotechnical engineering and engineering geological services to characterize the type and engineering properties of soil and rock materials along the twin 1,800-lineal-foot HDD crossings. Our services included onshore and over-water geophysical surveys, an extensive drilling and sampling program, deep test pits to observe cobble and boulder dimensions, and an elaborate geotechnical laboratory testing program. Using those data, we estimated depth to critical subsurface rock materials, performed hydraulic fracturing (frac-out) analyses, and provided design recommendations for the HDD and dry-well lift station. Our services were completed on time and within budget.

 
Stillwater Business Park Bridges
Redding
top

CGI Technical Services provided geotechnical engineering and engineering geological services for the design of two large bridges across Stillwater creek into the proposed 700-acre Stillwater Business Park. Both bridges are reinforced concrete, box-girder bridges with lengths of 300 and 425 feet. The structures will be supported on one or two bents that rest on 70-ton H piles. CGI Technical Services performed geophysical surveys, an extensive subsurface drilling program using conventional and all-terrain drill rigs, a detailed sampling and laboratory testing program, and provided geotechnical analyses and recommendations for pile design and construction, earthwork and fill placement, seismic design, and other parameters.

Ambrosini School
Fortuna
top

CGI Technical Services was selected to provide geotechnical engineering services for the design and construction of a number of additions and a new wing at the Ambrosini School, within the Rhonerville School District in Fortuna, California. The additions include a new classroom wing, a multipurpose room, a new kitchen, and an expanded parking lot. CGI Technical Services performed a detailed exploration and laboratory testing program, geohazards evaluation, and geotechnical assessment to provide recommendations for the design and construction of the improvements. The site has a high potential for liquefaction under earthquake forces and our assessment included recommendations for reducing the impact to the improvements due to liquefaction.

 

Owen’s Student Services Building
Simpson College, Redding
top

CGI Technical Services performed a geotechnical study of the proposed three-story student services building at Simpson College, in Redding California. The structure is about 30,000 square feet and rests on shallow foundation systems. Services provided included geotechnical engineering investigation, special inspections, and sampling and testing of soils.

The site was explored using deep excavations and an extensive laboratory program was completed to help CGI Technical Services evaluate allowable bearing capacities for the structure, which has relatively large column and continuous foot loads. The extensive laboratory testing and geotechnical evaluation allowed CGI Technical Services to reduce conservatism and, ultimately, saved Simpson College money on construction of foundation systems.

 
Oakdale Heights Assisted Living Facility
Redding
top

CGI Technical Services performed a geotechnical study for this project that involved construction of a three-story metal-framed building, on an approximate 4-acre parcel. The building encompasses approximately 10,000 square feet in plan area. The building consists of a three-story metal-framed structure with concrete slab-on-grade floors. Asphalt concrete pavement for parking areas and driveways covering the majority of the remaining site. Appurtenant construction includes retaining walls, underground utilities, storm drainage and landscaping. Services provided included geotechnical engineering investigation, special inspections, and sampling and testing of soils

 
Best Buy Commercial Structure
Redding
top

CGI Technical Services provided geotechnical engineering and construction materials testing and special inspection services during construction of the Best Buy Retail Outlet located in Redding, California. The project consisted of a single story 30,000 square foot masonry and steel-framed building with a concrete slab-on-grade. The structure is founded on continuous and isolated foundations. Services provided included geotechnical engineering investigation, and special inspection and sampling and testing of: soils, structural masonry, concrete, structural steel and welding, high strength bolts and bolting, and chemical and mechanical anchorages.

Prior to development, this site was underlain by soft compressible soils that would have exceeded settlement tolerances if not mitigated. CGI Technical Services performed an extensive exploration, testing, and analytical program to identify options to reduce anticipated settlement to within acceptable tolerances. After evaluating these options, a preferred alternative was identified and constructed.

 
Redding, Fall River Mills, Round Valley and Klamath Falls International Airports
top

CGI Technical Services provided geotechnical services for the expansion and rehabilitation of these airports. The projects involved an extensive exploration and laboratory testing program at each airport to evaluate CBR values and subsurface geotechnical conditions. Those values were utilized to estimate the modulus of subgrade reaction so that concrete pavement sections could be prepared for the proposed improvements. In addition, the CBR values were provided for use in asphaltic concrete pavement section design for apron rehabilitation and reconstruction, and for the expansion and construction of new taxiways.

 
Fairchild Medical Center
Yreka
top

CGI Technical Services provided geotechnical engineering, construction materials testing and special inspection services during construction of the new medical office buildings and street improvements located in Yreka, California. The project consisted of three, two-story buildings with cast-in-place concrete slab-on-grade floors. The structures are founded on continuous and isolated foundations. Services provided include preparation of the geotechnical engineering report, observation, and testing during site grading, testing and special inspection of reinforcing steel, concrete, and structural steel and welding.

 
Cost Plus World Market Commercial Structure
Redding
top

CGI Technical Services provided geotechnical engineering, construction materials testing, and special inspection services during construction of the Cost Plus World Market Retail Outlet located off Hilltop Drive in Redding, California. The project consisted of a single story 19,000 square foot masonry and steel-framed building with a cast-in-place concrete slab-on-grade. The structure was founded on continuous and isolated foundations. Services provided included geotechnical engineering investigation, special inspections, and sampling and testing of: soils, structural masonry, structural concrete, structural steel and welding, high strength bolts and bolting, and chemical and mechanical anchorages.

Prior to development, this site was underlain by soft compressible soils that would have exceeded settlement tolerances if not mitigated. CGI Technical Services performed an extensive exploration, testing, and analytical program to identify options to reduce anticipated settlement to within acceptable tolerances. After evaluating these options, a preferred alternative was identified and constructed.

 
CONSTRUCTION MATERIALS INSPECTION & TESTING

Hilltop Commercial Developments, Phases I - IV
Redding
top

CGI Technical Services provided geotechnical engineering and/or construction materials testing and special inspection services during construction of the four phases of the Hilltop Commercial Developments, located in Redding. Those projects totaled over 150,000 square feet of single-story masonry and steel-framed buildings with cast-in-place, concrete slabs-on-grade. The structures house Pier 1, Michael’s, T.J. Max, Bed Bath & Beyond, Cost Plus World Market, and Best Buy stores and were founded on continuous and isolated foundations. Services provided included geotechnical engineering investigation, special inspections, and sampling and testing of: soils, structural masonry, structural concrete, structural steel and welding, high strength bolts and bolting, and chemical and mechanical anchorages.

 
Colusa Rice
Rice Storage Warehouse
Colusa County
top

CGI Technical Services provided geotechnical engineering, construction materials testing, and special inspection services for the new rice storage warehouse located in Colusa, California. The project consisted of a single-story concrete and structural steel-framed building with a cast-in-place concrete slab-on-grade floor. The structure was founded on continuous and isolated foundations. Services provided included geotechnical engineering, testing during site grading, testing and special inspection of; rebar, structural concrete, structural steel and welding (shop fabrication and field erection including nondestructive examination), high strength bolts, and chemical and mechanical anchorages.

 
Safeway Retail Centers and Fuel Stations
Redding
top
 

CGI Technical Services is providing construction materials testing and special inspection services during construction of the Safeway Store located at Cypress and at Pine in Redding, California. The project consists of two shopping centers, each having a single story, 55,000 square foot pre-fabricated concrete tilt-up and steel-framed building with a concrete slab-on-grade. The structures are founded on continuous and isolated foundations. Services provided included special inspection and sampling and testing of: soils, structural masonry, concrete, floor flatness, structural steel and welding, and chemical and mechanical anchorages.

 
Caltrans QC/QA Districts 1, 2, 3, 6, 9 and 10
top

CGI Technical Services has successfully provided Caltrans asphalt concrete QC/QA services on over 35 paving projects. Our services include: preparation of Quality Control Manuals; AC mix designs and aggregate quality testing; test strip correlations; asphalt concrete testing (stability, swell, air voids, oil content and aggregate gradation); QC/QA testing and inspection: grade inspectors, field density technicians, and plant inspectors; QC/QA Manager to interface with Caltrans, solve problems as they occur, calculate pay factors, etc.; laboratory testing of AC for maximum densities and stability); and, daily reporting of field and laboratory tests and calculated pay factors. The average annual AC tonnage designed, tested and inspected by CGI Technical Services is approximately 450,000 tons.